Timber by EMSIEN 3 Ltd BG

Infrastructure Design & Supervision

  • Contract ER369QP (Land Transport Authority) Appointment of Qualified Person (Supervision) for construction of Seng Kang West road from Yio Chu Kang road to TPE
  • RP228D Design and Construction of Cycling Path Network in Sembawang
  • R377QP  Appointment of QP(S) for Contract ER377 Proposed Covered Pedestrian Overhead Bridge, Covered Linkway and Bus Shelter at Upper Paya Lebar Rd Near Rochdale Rd
  • PUB improvement to roadside drains IV Contract 38-1 (Queen Astrid Park, Benoi Rd and Wan Lee Rd Area)
  • PUB improvement to roadside drains IV 38-2 (Sunset Drive, Clementi Ave and Tiong Bahru area)
  • PUB replacement of open scupper inlets / drains and existing drop inlets chambers to new drop inlet chambers – road opening and QECP – 100 locations
  • Contract 2118A Road Diversion Works (Package A) – QP(D)
    a) Rochor Canal bridges demolition
    b) Box culvert and foundation design
  • Traffic Control / Management Plan for the following projects:
    a) ER296 Sentosa Gateway project
    b) PUB improvement to Alexandra Canal project
    c) Proposed condominium housing development comprising   7 blocks of 19-storey apartments (total 530 units) with 2 basement carparks, landscape deck & communal facilities at Punggol Field Walk / Punggol Field / Punggol East project
  • Contract RD265 Appointment of QP(S) for Contract VT353 Addition and Alteration works at St Michael Bus Terminal
  • RD261 Appointment of QPS for Contract VT360 - A&A works at Bukit Merah Bus Interchange
  • LTA Contract for Sewer Diversion Works Contract T2119A